How many workstations can one softwiring circuit support?
This depends on the electrical load and the building’s wiring. Most systems typically support 24 to 32 GPO points per circuit. Always consult a licensed electrician for specific advice.
This depends on the electrical load and the building’s wiring. Most systems typically support 24 to 32 GPO points per circuit. Always consult a licensed electrician for specific advice.
does require installation, but the basket is detachable.
Just click and connect, easy to use product.
Great product and customer service
Works well and is eay to use.
Leads - 3-PIN PLUG THERMAL OVERLOAD STARTER LEAD
Cables arrived on time and were exactly what the description said they would be
Great product but it took a 4 weeks to make and arrive
Got what I wanted and payed for very good doing business with them.
In-Desk Module - ECHO: 1 (Single) GPO, USB C/A Fast-Charging Outlets with 1500mm lead and 3-Pin Plug Lead
Needed to extend power under a long study desk. Soft wiring shop had everything needed to get this done. Prompt service and delivery.
Excellent Quality and Fast Delivery
Leads - 3-PIN PLUG THERMAL OVERLOAD STARTER LEAD
Item came on time and price was reasonable